2,600 SF Townhouse Renovation | 5 bedrooms | 3.5 Baths
Demolition Wallbreaking: September 2014 | Move-in Date: Thanksgiving Day 2014
Catherine MacFee Interior Design | Gary Davis Group Arch/Engineering
Sugar Bowl townhouse renovation in Lake Tahoe
TJ Glidden Construction began this 2,600 SF townhouse renovation in September 2014, with move-in completed on Thanksgiving Day 2014.
The renovation includes five bedrooms and 3.5 bathrooms, blending functional living spaces with thoughtful design.
TJ Glidden Construction partnered with Catherine MacFee Interior Design and Gary Davis Group Arch/Engineering on this project.